SYEDENG provided full MEP detailed design consultancy for a shell and core warehouse located on Riverway Harlow with an area of 8023 m². This also included electrical design for car park lighting and EV chargers.
Key Features
BREEAM ‘Very BREEAM ‘Very Good’ 2014
PV installation allowance for future
Heat recovery VRF and MVHR system within the offices to reduce electrical requirements.
Leak Detection Panels and Solenoid Valves used to achieve BREEAM requirement
Lighting Controls within offices
EV Car Chargers provided
Sub-metering provided to comply with BREEAM requirements